Here is a collection of Jobs that we have done and are doing.
Before and After
Jobs in Progress
Cable running down floating wall J-hooks keep cable neat and give a path for future cabling to follow cable installed well above the ceiling line ensures cable doesn’t get damaged cable run in center to service both sides of the hall Service loops above the jack location make future moves possible sleeves and fire caulk are installed when penetrating a firewall cubicles often require even spacing and multiple drops it is good to run cable under air ducts to keep cable from pressing against ducts and restricting air flow pre-cabling before the ceiling is in make installation neater and quicker
Completed Jobs
back of patch panel 110 style wall mount data rack back of patch panel keystone style Velcro used to dress cable and add future cable cable dressed above ceiling 170 plus cables terminated! cables dressed and terminated closeup of terminated rack